* The expertise service prices above do not include value-added tax (VAT).
Unit: 1,000 VND / work unit at standard expertise deadline
| No. | IP Object Type | Unit | Unit Price (Pᵢ) (× 1,000 VND) |
Notes |
|---|---|---|---|---|
| 1 |
Patent / Utility Solution SC/GPHI
|
One expertise content for 01 examined technical solution compared with 01 independent claim of the protection scope; directly analysed material of no more than 06 pages. |
4.500
× 1,000 VND
|
One subject = one product or one technical process/method. With 02 or more independent claims, multiple comparison titles, or required testing: separate quote.
From the 7th page of directly analysed material: each page + 50
Each additional dependent claim to assess + 600 |
| 2 |
Integrated Circuit Layout Design (TKBT) TKBT
|
One expertise content for 01 examined layout design compared with 01 protected layout design, with no more than 02 diagrams/images. |
3.750
× 1,000 VND
|
One subject = one structure/layout design of a semiconductor integrated circuit.
From the 3rd diagram/image: each + 300
|
| 3 |
Trademark NH
|
One expertise content for 01 examined sign compared with 01 protected trademark, in 01 class of no more than 06 goods/services. |
2.000
× 1,000 VND
|
One subject = one sign shown on goods, packaging, service means, transaction documents, signboards, advertising or business means. Multiple comparison trademarks or sign presentations: separate quote.
Each goods/services class from the 2nd (≤06 items) + 250
Within each class, from the 7th item + 60 |
| 4 |
Geographical Indication CDĐL
|
One expertise content for 01 examined sign/subject compared with 01 protected geographical indication and 01 product. |
2.500
× 1,000 VND
|
With multiple products, multiple comparison geographical indications, or required origin survey/special-condition assessment: separate quote.
|
Expertise prices for industrial designs and other IP objects will be announced when the Company begins providing these services.
The expertise service price coefficient (K) corresponds to the deadline requested by the Client, determined per Table 2 below.
T: expertise completion deadline (working days).
| No. | SC / GPHIPatent / Utility Solution | TKBTLayout Design | NH / CDĐLTrademark / Geographical Indication | K Coefficient |
|---|---|---|---|---|
| 1 | 66 daysStandard | 44 daysStandard | 33 daysStandard | 1,00 |
| 2 | 56 – 65 days | 38 – 43 days | 28 – 32 days | 1,10 |
| 3 | 46 – 55 days | 31 – 37 days | 23 – 27 days | 1,20 |
| 4 | 36 – 45 days | 24 – 30 days | 18 – 22 days | 1,35 |
| 5 | 26 – 35 days | 17 – 23 days | 13 – 17 days | 1,50 |
| 6 | 16 – 25 days | 10 – 16 days | 08 – 12 days | 1,75 |
| 7 | 10 – 15 days | 06 – 09 days | 05 – 07 days | 2,00 |
| 8 | Under 10 days | Under 06 days | Under 05 days | 2,50 |
| 9 | Under 9 days | Under 5 days | Under 4 days | 3,00 |
| 10 | Under 8 days | Under 4 days | Under 3 days | 4,00 |
Notes on deadline:
1. The deadline is counted in working days from the date the Company simultaneously receives a complete valid dossier and the contractual advance payment.
2. Time for the Client to supplement/amend/clarify the dossier; waiting time for testing, survey, third-party materials, or force majeure is not counted.
3. A deadline request is accepted only after the Company assesses quality assurance, independence and staffing; the Company may decline an unfeasible deadline.
4. If the actual deadline falls between levels, the coefficient of the corresponding range applies.
The following costs are determined by separate quote or by reasonable, valid actual costs, and arise only after the Client’s written approval:
Need a specific price quote for your request?
Quang Minh IPE team is ready to calculate and send a free detailed quote for each expertise case.